Construction process of the 'Constitución de 1812' cable stayed Bridge over the Cadiz Bay

Authors

  • Lucas Serrano, C.; Martínez Cutillas, A.

Keywords:

Construction sequence; Cable-stayed deck; Balanced cantilever; Segment

Abstract

Balanced cantilever method has been use to erect the cable-stayed section of the Constitución de 1812" bridge over Cadiz Bay. Standard segments are 20 m long and 34 m width and weigh 4.000 kN.The construction sequence has been determined by the ultimate resistance of the tower that must resist the unbalanced bending moments at both sides of the tower."

Downloads

Published

2016-01-03

How to Cite

Lucas Serrano, C.; Martínez Cutillas, A. (2016). Construction process of the ’Constitución de 1812’ cable stayed Bridge over the Cadiz Bay. Hormigón Y Acero, 67(278-279). https://hormigonyacero.com/index.php/ache/article/view/1877