[1]
W. Eilzer, M. Müller, M. Schumm, M. Romberg, R. Rodríguez Molina, and F. Gutiérrez Manzanedo, “Replacement of the cable-stayed bridges over the river Rhine in Leverkusen and Duisburg”, hya, vol. 73, no. 297, pp. 23–30, Aug. 2022, doi: 10.33586/hya.2020.2390.