Loscos Areoso, P., Bajo Pavía, C. and Sánchez Ramírez, J.J. (2025) “Construction Sequence of the Bridge Over Deusto Channel in San Ignacio Neighborhood, Bilbao”, Hormigón y Acero, 76(305), pp. 99–106. doi:10.33586/hya.2020.2797.