Three bridges built with "in situ" sucessive spans construction method

Authors

  • del Pozo Vindel, F.J.; Arrieta Torrealba

Keywords:

Abstract

This report presents three continuous road bridges built with prestressed concrete. The construction method was the ""in site"" sucessive span with partial prestresses. The maximum span in all of three bridges is over the 50 m and their total length is in the bigest of then up to 530 m. The transversal section is in all cases a unique box girder with a maximum total width of 14,0 m.

Published

1989-01-01

How to Cite

del Pozo Vindel, F.J.; Arrieta Torrealba. (1989). Three bridges built with "in situ" sucessive spans construction method. Hormigón Y Acero, 40(170). https://hormigonyacero.com/index.php/ache/article/view/848