Some ideas about launched-bridges previous design: launching with provisional cable-stayed tower and short steel nose

Authors

  • Iglesias Pérez, C.; Fernández Casado, C.

Keywords:

Abstract

In this paper incremental lauched bridges technique with ""short"" steel nsose and provisional cable-stayed tower is duscussed. This study completes the already published paper about launched-bridges with ""normal"" steel nose. Some relationships between the main parameters governing the cable-stayed system are proposed and four parametric studies are performed in order to determine the optimum design (height of the tower and anchorage point of the cable-stayed system) based on economic criteria.

Published

1992-01-03

How to Cite

Iglesias Pérez, C.; Fernández Casado, C. (1992). Some ideas about launched-bridges previous design: launching with provisional cable-stayed tower and short steel nose. Hormigón Y Acero, 43(183). https://hormigonyacero.com/index.php/ache/article/view/672