Cable stayed footbridge, to access the intake tower of the Francisco Abellán Dam

Authors

  • Llombart, J.A.; Revoltós Fort, J.

Keywords:

Abstract

This paper describes a cable stayed footbridge, built to access the intake tower of the Francisco Abellán Dam. The footbridge is a symmetric structure with two spans of 45,00 m each, and a composite box girder. The construction was done by launching the wall steel structure from one hillside, in order to avoid expensive lifting means due to high cliff.

Published

1996-01-05

How to Cite

Llombart, J.A.; Revoltós Fort, J. (1996). Cable stayed footbridge, to access the intake tower of the Francisco Abellán Dam. Hormigón Y Acero, 47(201). https://hormigonyacero.com/index.php/ache/article/view/484