Lecciones aprendidas del diagnóstico y desmontaje del paso superior Joaquín Costa – Francisco Silvela, Madrid (Experience Achieved After Diagnosis and Dismantling of the Overpass Joaquín Costa - Francisco Silvela. Madrid)
DOI:
https://doi.org/10.33586/hya.2026.4163Keywords:
stress-corrosion, britlle failure, alkali-aggregate attack, 'excess' of prestressingAbstract
Built in 1969, this prestressed concrete viaduct had shown some issues and, eventually, a broken tendon in February 2020. Further inspection of the viaduct revealed that c. 10% of the tendons had that same problem, and that concrete had experienced a severe alkali-aggregate reaction. This meant that fck had experienced at least a 50% decrease compared to what it was originally. This rendered the structure’s safety inadmissible and insurmountable, leading us to advise Madrid’s City Council to close the viaduct to traffic and dismantle it. The support from the Engineering School of Madrid and our perseverance enabled us to carry out two valuable autopsies simultaneously. Their results enabled us to confirm the diagnosis.