Execution of the dock in the Crinavis basin

Authors

  • Patiño Cajide, M.; Illescas Villa, J.M.

Keywords:

Abstract

This section covers all aspects of the construction of the dock, including a study of the main factors affecting the execution of the works at the dry dock in Algeciras Bay: ? The Crinavis Basin. ? Site facilities. ? Provisional foundations. ? Execution stages: Division into eight modules ("Plots"). ? Formwork, reinforcement and concrete-pouring. ? Full scale tests. ? Pre-stressing process: cable and reinforcing bar families. ? Special ball joint area (clamping to the concrete).

Published

2002-01-01

How to Cite

Patiño Cajide, M.; Illescas Villa, J.M. (2002). Execution of the dock in the Crinavis basin. Hormigón Y Acero, 53(223). https://hormigonyacero.com/index.php/ache/article/view/301