Bridge Over the Danube River at Bratislava (Motorway D4). East Approach Bridge, Built up Span by Span Using a Movable Scaffolding System
DOI:
https://doi.org/10.33586/hya.2020.2761Keywords:
prestrressed concrete, box girder, overhangs, span by span, movable scaffolding systemAbstract
East Approach viaduct to the bridge over the Danube river is a continuous prestressed concrete bridge, 1250.5m long and 35m wide. The bridge typical section is built up in two phases, using a movable scaffolding system and a wing traveler. A detailed study of the non-linear stress distribution on the deck typical section has been useful to optimize the prestressing steel quantification, in order to define a single internal bonded post- tensioning tendon system, not being necessary to design an extra external prestressing system inside the deck box core, as usual in other comparable recent realizations.