O’Donnell Bridge Over M-30 Refurbishment (Madrid, Spain)

Authors

  • Luis Sopeña Corvinos 1790
  • Juan Jesús Álvarez Andrés
  • José Enrique Silvo González
  • Noemí Corral Moraleda
  • Tomás Ripa Alonso

DOI:

https://doi.org/10.33586/hya.2020.2749

Keywords:

retrofit, upgrade, rehabilitation, concrete, crack, repair, CFRP

Abstract

Within Calle 30 infrastructure maintenance plan the refurbishment of the bridge over M-30 for O’Donnell street (M-23), from 1970. The intervention involved abutments, piers and deck, where more deep structural retrofit was necessary, highlighting the upgrade of the barriers, for which a H4b level of protection is required as per the new regulation applicable. Taking into account criteria such as dynamic deflection and working width, a steel barrier anchored chemically to the deck was selected, deck that was previously reinforced with a system of CFRP laminates.

Downloads

Published

2025-04-28

How to Cite

Sopeña Corvinos, L., Álvarez Andrés, J. J., Silvo González, J. E., Corral Moraleda, N., & Ripa Alonso, T. (2025). O’Donnell Bridge Over M-30 Refurbishment (Madrid, Spain). Hormigón Y Acero, 76(305), 147-154. https://doi.org/10.33586/hya.2020.2749