Construction supervision of the Almonte Viaduct

Authors

  • Guillermo Capellán Miguel
  • Javier Martínez Aparicio
  • Emilio Merino Rasillo
  • Pascual García Arias

DOI:

https://doi.org/10.33586/hya.2019.2065

Keywords:

arch, concrete, site control, geometry, monitoring, data management

Abstract

.

The new Madrid-Extremadura/Talayuela-Cáceres high-speed rail line, in its Reservoir of Alcántara-Garrovillas sub-section, saves River Almonte on its arrival to the reservoir by means of a concrete arch with a 384-m span. This great structure is a first-rate construction challenge for site control works, given the necessary quality required in its execution for the success of the work.