Quality assurance system at the Constitucion de 1812 Bridge over the Cadiz Bay

Authors

  • Reyes Cadenas, R. de los; Gomá Matilla,

Keywords:

Quality assurance, Welding control, Concrete control, On-site laboratory, Special testing concrete and steel

Abstract

Quality assurance system of the Constitution of 1812 cable-stayed Bridge over the Cádiz Bay has been made by attention to the particular requirements of the work. The best tools have been used to achieve a «0 defects» target via communication and control of the human factor.

Downloads

Published

2016-01-03

How to Cite

Reyes Cadenas, R. de los; Gomá Matilla,. (2016). Quality assurance system at the Constitucion de 1812 Bridge over the Cadiz Bay. Hormigón Y Acero, 67(278-279). https://hormigonyacero.com/index.php/ache/article/view/1894