1.
FOJMC. Control and analysis of the assembly of the stay bridge Fernando Reig upon the River Barxell in Alcoy. hya [Internet]. 1Jan.1989 [cited 18May2024];40(170). Available from: http://hormigonyacero.com/index.php/ache/article/view/846